Difference between revisions of "Taking MAIN detector Counting Run"

From PREX Wiki
Jump to navigationJump to search
Line 1: Line 1:
* Set the HV for DN-Quartz (MAIN) detectors to -1900V (as explained in [https://prex.jlab.org/wiki/index.php/HVgui HVgui])
+
* Set the HV for DN-Quartz (MAIN) detectors in both arms to -1900V (as explained in [https://prex.jlab.org/wiki/index.php/HVgui HVgui])
*
+
* Enable the HV channels
 +
* Turn ON scintillators
 +
* Turn ON VDCs ('''NOTE''':Make sure the scintillator rate is below 500k before turning VDC ON)
 +
* Take counting runs on both arms (LHRS and RHRS) atleast 200k events
 +
* To analyze the runs:
 +
** ssh -Y a-onl@aonl
 +
** goprex
 +
** analyzer -l
 +
** .x setup2.C(runnumber,200000)
 +
* When you are done with taking counting data '''turn OFF''' the '''DN-Quartz (MAIN) detectors HVs'''
 +
* For safety, set their HV to production level at the end

Revision as of 13:30, 13 December 2019

  • Set the HV for DN-Quartz (MAIN) detectors in both arms to -1900V (as explained in HVgui)
  • Enable the HV channels
  • Turn ON scintillators
  • Turn ON VDCs (NOTE:Make sure the scintillator rate is below 500k before turning VDC ON)
  • Take counting runs on both arms (LHRS and RHRS) atleast 200k events
  • To analyze the runs:
    • ssh -Y a-onl@aonl
    • goprex
    • analyzer -l
    • .x setup2.C(runnumber,200000)
  • When you are done with taking counting data turn OFF the DN-Quartz (MAIN) detectors HVs
  • For safety, set their HV to production level at the end