Difference between revisions of "RunPlanDaily CREX"

From PREX Wiki
Jump to navigationJump to search
Line 36: Line 36:
 
| Swing
 
| Swing
 
|  Spin Dance, 150uA to dump
 
|  Spin Dance, 150uA to dump
|   
+
Experts: Caryn, Devi
 
|-
 
|-
 
| rowspan="3" | Wednesday, Jan 8  
 
| rowspan="3" | Wednesday, Jan 8  
 
| Owl
 
| Owl
 
| 150uA, bcm/det calibration, damping measure, bmw initialization...production
 
| 150uA, bcm/det calibration, damping measure, bmw initialization...production
|  
+
| Experts: Caryn, Devi, Ye
 
|-
 
|-
 
| Day
 
| Day
 
| Tuning through chicane 150uA, FFB recheckout, damping (if measured poor)  
 
| Tuning through chicane 150uA, FFB recheckout, damping (if measured poor)  
|  
+
| Experts: (Yves) Caryn, Adam
 
|-
 
|-
 
| Swing
 
| Swing
 
| If compton locks, compton commissioning. Else, BMW 1H01 tune, production
 
| If compton locks, compton commissioning. Else, BMW 1H01 tune, production
 +
|
 
|-
 
|-
 
| rowspan="3" | Thursday, Jan 9
 
| rowspan="3" | Thursday, Jan 9

Revision as of 16:05, 7 January 2020



CREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Comments/Status
Monday, Jan 6 Owl
Day
Swing Moller Lock, FFB low current, Optics Raster Iy issue resolved, all same as Dec.
Tuesday, Jan 7 Owl Optics Larm det ul base replaced
Day Mott, Spin Dance Vac gauge readout 1-e12, vac adjacent fine (not urgent, to be fix later)
Swing Spin Dance, 150uA to dump Experts: Caryn, Devi
Wednesday, Jan 8 Owl 150uA, bcm/det calibration, damping measure, bmw initialization...production Experts: Caryn, Devi, Ye
Day Tuning through chicane 150uA, FFB recheckout, damping (if measured poor) Experts: (Yves) Caryn, Adam
Swing If compton locks, compton commissioning. Else, BMW 1H01 tune, production
Thursday, Jan 9 Owl Production
Day Production
Swing Production
Friday, Jan 10 Owl Production
Day Production
Swing Production

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history CREX
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting