Difference between revisions of "WAC Notes January 29 2020"

From PREX Wiki
Jump to navigationJump to search
Line 23: Line 23:
 
=== Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production ===
 
=== Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production ===
  
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run5655_000 Run 5655] - Cut at 150k-170k to remove beam motion (caused by 120 uA running)
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6033_000 Run 6033]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6034_000 Run 6034]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6036_000 Run 6036]
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Revision as of 12:08, 30 January 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 27 2020 << >> WAC Notes January 30 2020

January 29 2020

Daily Meeting BlueJeans

Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • FFB and orbit locks seem to be breaking, so there is no beam delivery for now

Updates

  • New sign corrected Grand Agg plots have been added to the WAC toolchain (make_grand_plots.sh)
  • We still need to do 1H01 BMOD tuning
  • And we need to get a fresh calibration run (which will be relevant for all data taken with the NEW target)
    • After that calibration run Ryan will likely move an AT or two (and need another calibration run)
  • Cameron is trying to get bmw corrected data into the WAC chain