Difference between revisions of "WAC Notes January 30 2020"

From PREX Wiki
Jump to navigationJump to search
Line 23: Line 23:
 
No data today, the beam comes back at about 17:00, ATLis Procedures happened in the next hour, after that, we spent some time (~ half hour) to find the target tungsten collimator.  
 
No data today, the beam comes back at about 17:00, ATLis Procedures happened in the next hour, after that, we spent some time (~ half hour) to find the target tungsten collimator.  
 
Compton tuning (?) comes next, which didn't finish until 23:30 and was followed by BeamMod Commissioning. We start taking data at about 2:30 the next day (1.31).
 
Compton tuning (?) comes next, which didn't finish until 23:30 and was followed by BeamMod Commissioning. We start taking data at about 2:30 the next day (1.31).
 +
 +
Hall C requests IHWP switch twice, but we don't take any data, so Cameron changes the slug number back to 121 manually.
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Revision as of 13:16, 31 January 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 29 2020 << >> WAC Notes January 31 2020

January 30 2020

Daily Meeting BlueJeans

No data today, the beam comes back at about 17:00, ATLis Procedures happened in the next hour, after that, we spent some time (~ half hour) to find the target tungsten collimator. Compton tuning (?) comes next, which didn't finish until 23:30 and was followed by BeamMod Commissioning. We start taking data at about 2:30 the next day (1.31).

Hall C requests IHWP switch twice, but we don't take any data, so Cameron changes the slug number back to 121 manually.

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • FFB and orbit locks seem to be breaking, so there is no beam delivery for now

Updates