WAC Notes February 9 2020
From PREX Wiki
Revision as of 04:08, 10 February 2020 by Rahmans (talk | contribs) (→Production Run List - Slug 133 - IHWP OUT - Flip-RIGHT - Production)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 8 2020 << >> WAC Notes February 10 2020
February 9 2020
Daily Meeting BlueJeans
Production Run List - Slug 133 - IHWP OUT - Flip-RIGHT - Production
In general, detector slopes continue to get bigger and BCM widths continue to deteriorate in line with trend from the last slug
- Good - Run 6314
- Current : 150 uA
- BCM : Good. Width ~ 305.2 (excursion - bcm0l02)
- BPM : Good.
- Detectors: Good.
- Good - Run 6315
- Current : 150 uA
- BCM : Good. Width ~ 292.9
- BPM : Good.
- Detectors: Good.
- Good - Run 6316
- Current : 150 uA
- BCM : Good. Width ~ 326.4 (excursion - bcm0l02)
- BPM : Good.
- Detectors: Good.
- Good - Run 6317
- Current : 150 uA
- BCM : Good. Width ~ 290.7
- BPM : Good.
- Detectors: Good.
- Good - Run 6318
- Current : 150 uA
- BCM : Good. Width ~ 295.1
- BPM : Good.
- Detectors: Good.
- Good - Run 6319
- Current : 150 uA
- BCM : Good. Width ~ 294
- BPM : Good.
- Detectors: Good.
Production Run List - Slug 134 - IHWP IN - Flip-RIGHT - Production
https://logbooks.jlab.org/entry/3780677