WAC Notes November 12 2020
From PREX Wiki
Jump to navigationJump to searchRCDB | HALOG | HAPLOG | DocDB | Online Prompt | BlueJeans Link | Runlist spreadsheet |
---|
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << WAC Post-Run_Meeting Notes
WAC Notes November 5 2020 << >> WAC Notes November 19 2020
Organization
Date and time: November 12, 2020, 11:00am
Bluejeans ID: 454783784
Meeting link: https://bluejeans.com/454783784
Runlist spreadsheet
Suggested Changes
Each WAC will suggest changes for their run period, which will be discussed at this meeting:
Cameron
- Slug 186 - 7626 - was not included before - is the very first run, it has 5 sigma Aq (no Aq feedback) and FFB commissioning/noise, but otherwise is fine
- Slug 186 - 7627 - was included before - Has 2 sigma Aq (bad Aq feedback). Also, FFB turning on an off is a mess, but as far as I can tell, there is no negative impact on slopes or corrections (so it should be tolerated)
- Slug 186 - 7628 - needs cuts - One very brief 1.5 mm 12X jump
- Slug 186 - 7630 - needs cuts - Another brief 1.5 mm 12X jump
- Slug 186 - 7631 - needs cuts - Another brief 1.5 mm 12X jump
- Slug 186 - 7632 - Really huge FFB noise... is it worth keeping the 150um + BPM Y RMS data? X is OK.
Sakib
Weibin
Victoria
Robert
General
- Need global cuts on ATs