Weekly Meeting Discussion Topics

From PREX Wiki
Revision as of 15:05, 7 January 2019 by Ciprian Gal (talk | contribs)
Jump to navigationJump to search

Back to PREX/CREX_Teleconferences

List of discussion topics

Task Responsible Status Update Next update Link to updates
Scheduling for PQB time at the end of APEX CG list of tasks is crystalized every 6 weeks 01/08/2019 Nov 27 2018
Injector setup and feedback Caryn, Amali All set for Jan install of RTP every 5 weeks 01/15/2019 Dec 11 2018
Beam modulation Victoria, Ye started work, task list ready every 4 weeks 01/08/2019 Dec 4 2018
Design status Kent everything on track, deadline for everything to be ready March 11th every 4 weeks 01/15/2019 Dec 4 2018
GEM detectors Dustin, Seamus every 4 weeks 01/22/2019 Dec 18 2018
Ion chamber positions CG task should be simple. will iterate through simulation every 6 weeks 02/04/2018 Dec 11 2018
Moller polarimeter Eric, Sanghwa, Don - every 4 weeks 01/15/2018 Dec 11 2018
Data Acquisition Bob DAQ upgraded to bank readout. system on track every 4 weeks 01/22/2018 Dec 11 2018
Tracking and optics Chandan, Seamus every 4 weeks 01/22/2018 Dec 18 2018
Integrating detectors Dustin - every 6 weeks 12/18/2018 -
Analyzer Paul several projects being worked on in parallel every 4 weeks 01/29/2019 Dec 18 2018
Compton polarimeter Adam, Amali, CG opened vacuum and replaced mirrors. will try locking every 4 weeks 01/15/2019 Dec 18 2018
Cavity Beam Monitors Ye limited test done using epics readout, working DAC still pending every 6 weeks 01/08/2019 Nov 27 2018
Integrating Beam Monitors CG - - 01/08/2019 -