Shift Checklist

From PREX Wiki
Jump to navigationJump to search

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main<< Information for Shift Takers << Shift Taker Responsibilities

Finding the checklist

  • Open the checklist
  • If you are not already logged in, do so by clicking in the upper right of the page
  • You should now be able to click Log in the upper left
  • In log mode, you will be able to add notes in the boxes at the right
  • Click the checkbox at the left of each item once it is complete

Item Instructions

  • Entering shift info
    • Enter the names of the shift workers (Shift leader, Target operator, Analysis expert)
    • Indicate which shift the checklist is for (day, swing, or owl)
  • Information about the beam
    • Is alarm handler running on hacweb7?
    • Is the volume up on hacweb7? (both hardware and software)
    • Beam Energy (GeV)
    • Beam current (µA)
    • Downstream raster (B) on? Yes/No
    • Raster size (x:y mm, see log 3654466 )?
    • Fast feedback on? Yes/No
    • Beam Position Monitor X/Y (mm) A
    • Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
    • BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) contact RC and halog
    • Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
    • VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall behind the door
    • Current Target
    • Argon pressure (psi)
    • Ethane pressure (psi)
    • CO2 pressure (psi)
    • Visual Hall Inspection OK?
    • Truck ramp door closed ( use the camera to see the door from mirror)?
    • Septum current (A) and polarity?
    • Upstream/downstream corrector currents (A) ?
  • Left Arm Checks
  • Right Arm Checks

Right arm momentum (GeV) Right Arm Q1, Q2,D,Q3 regulator on? (yes/no) Right arm cryo flow level OK? Yes/No He>60% (Ignore Nitrogen) Right Arm NMR OK? Yes/No Right Arm Q1 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q2 Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm D Momentum (GeV/c) / current (A) / B-Field (+/-G) Right Arm Q3 Momentum (GeV/c) / current (A) / B-Field (+/-G) Is Right VDC gas flow (top/bottom) on? Right VDC HV on (top/bottom)? Right Cerenkov HV on? Right Pion rejector HV on? Right s0/s2m HV on? Right SCIFI HV off (should be off during production runs, y/n)? S3 HV off (ch 6 of SCIFI HV GUI, should be off for production)? Check online plots (y/n)? -RHRS Latest run type (Test, Physics,..) Is the auto replay script running (ask the analysis expert)? Is the APEX run list (in a white binder) completed? Please attach the left/right HV and Scalers Screenshots to the shift report Time of beginning of latest run (RHRS) Latest run number Dead time (%) Beamtime accounting table submitted? Empty drip tray and place mug under spout on coffee maker