Date (2010) |
Shift |
---------- Activity (Responsible) ---------- |
--- Status ---
|
Monday 3 May
|
Owl
|
|
|
Monday 3 May
|
Day
|
- Hall B Pass change 3 -> 5 until ~1:00PM
- Compton vacuum, LHRS dipole UPS replacement during the down
- Bake compton chicane overnight during production, run beam straight through
- Return to PbD #2 production
- Large asymmetry run (Jon)
|
- Baking started, HRS work completed by Heidi
|
Monday 3 May
|
Swing
|
|
|
Tuesday 4 May
|
Owl
|
|
|
Tuesday 4 May
|
Day
|
- Work on switch for Pockels cell (start 9:00AM)
- Complete Compton beam line bake-out, leak check, cavity alignment
|
- Pockels cell switch work complete
- Compton vacuum reopened
|
Tuesday 4 May
|
Swing
|
|
- Continued Compton realignment/laser polarization measurement
|
Wednesday 5 May
|
Owl
|
|
- Stopped work on Compton - still not complete
- Changed beam spot size to 200x200um
|
Wednesday 5 May
|
Day
|
- 12 hours Moller tests, start 9:00AM (Sasha, Jixie)
|
|
Wednesday 5 May
|
Swing
|
- Finish Moller tests, 21:00
- Raster clock tests 22:00-24:00 (KK, Bob, Jon)
- Production as per raster clock tests
|
|
Thursday 6 May
|
Owl
|
|
|
Thursday 6 May
|
Day
|
- Beam Studies (8 hours controlled access starting 08:15)
- Finish Compton cavity work (Sirish, Abdurahim)
- Start Compton pumping, replace leaky upstream valve? (John Heckman et al)
- Remove GEM(s)?? (Alex, Kiad)
- Compton Boron installation (Megan)
|
- Continued compton cavity alignment
- Boron installed
- INFN GEMs removed to EEL, (additional UVA GEM installed?
|
Thursday 6 May
|
Swing
|
- Raster clock tests
- Production
|
|
Friday 7 May
|
Owl
|
- Raster clock tests (cont?)
- Production
|
- Tests aborted due to network switch failure in the hall
|
Friday 7 May
|
Day
|
- Production
- Wien flip, QE scan, spot move (nominally 9:00AM)
|
- Wien flip, QE scan, spot move completed.
- Compton valve work continued until 2:00
- Started detector alignment checks
- Q2 and establish low-current cavities (Dustin)
|
Friday 7 May
|
Swing
|
- Tests by KK et al
- Production
|
|
Saturday 8 May
|
Owl
|
|
|
Saturday 8 May
|
Day
|
- Production
- 2:00PM - Turn off cavity baking
- 3:00PM - Leak check, turn on ion pumps
- 4:00PM - Routine Moller Measurement
|
- Compton vacuum reestablished
- Replaced valve opens with sufficient vacuum levels
|
Saturday 8 May
|
Swing
|
|
- Moller measurement gives 91% polarization
|
Sunday 9 May
|
Owl
|
|
|
Sunday 9 May
|
Day
|
- Compton ready?
- Production
|
- Cavity locks at 3kW!
- Valve upstream of chicane will not open
|
Sunday 9 May
|
Swing
|
|
|
Monday 10 May
|
Owl
|
|
- Left dipole down
- Compton valve stuck
|
Monday 10 May
|
Day
|
- Fix left dipole
- Fix Compton valve
- Fix target vacuum
|
- Left dipole down
- Compton valve fixed and tested
- Target vacuum bad
|
Monday 10 May
|
Swing
|
- Standby
- Empty or C target oversampling runs if valves can be opened
- 1-arm production if target vacuum < 5E-5
|
- Left dipole down
- Target vacuum bad
|
Tuesday 11 May
|
Owl
|
- Standby
- Empty or C target oversampling runs if valves can be opened
- 1-arm production if target vacuum < 5E-5
|
|
Tuesday 11 May
|
Day
|
- Wien flip
- Beam studies -- injector studies
- Raster setup
- Fix left dipole
- Fix target vacuum
|
|
Tuesday 11 May
|
Swing
|
- Compton tune
- Oversampling tests
|
- Left dipole down
- Right dipole NMR down
- Target vacuum bad
|
Wednesday 12 May
|
Owl
|
|
- Left dipole down
- Right dipole NMR down
- Target vacuum bad
|
Wednesday 12 May
|
Day
|
- Repair left dipole PS
- Repair right dipole NMR
- Repair right Q3 bad bit
|
|
Wednesday 12 May
|
Swing
|
|
- Left dipole down
- Left Q3 controls problem
- Target vacuum bad
|
Thursday 13 May
|
Owl
|
|
- Left dipole down
- Left Q3 controls problem
- Target vacuum bad
|
Thursday 13 May
|
Day
|
- Repair left dipole PS
- Repair left Q3 controls
- Find and stop target vacuum leak
- Warm up target
|
|
Thursday 13 May
|
Swing
|
|
|
Friday 14 May
|
Owl
|
|
|
Friday 14 May
|
Day
|
|
|
Friday 14 May
|
Swing
|
- Cool target
- Re-establish beam
- Raster tests
|
- Target vacuum good
- Both spectrometers good
|
Saturday 15 May
|
Owl
|
|
|
Saturday 15 May
|
Day
|
- Access for left dipole regulation
|
- Left dipole regulation failed
- Target vacuum increase, then decrease with added heating
|
Saturday 15 May
|
Swing
|
- Access for left dipole regulation
- Re-establish beam
- Møller
|
- Left dipole regulation bad
- Target vacuum varying, mostly < 1e5
|
Sunday 16 May
|
Owl
|
|
- Left dipole regulation bad
- Target vacuum varying, mostly < 1e5
|
Sunday 16 May
|
Day
|
- Access for left dipole regulation
|
- Target vacuum varying, mostly < 1e5
|
Sunday 16 May
|
Swing
|
- Production
- Background test (L PMTs on)
|
- Left dipole regulation bad
- Target vacuum varying, mostly < 1e5
|
Monday 17 May
|
Owl
|
|
|
Monday 17 May
|
Day
|
|
|
Monday 17 May
|
Swing
|
|
|
Tuesday 18 May
|
Owl
|
|
|
Tuesday 18 May
|
Day
|
|
|
Tuesday 18 May
|
Swing
|
|
|
Wednesday 19 May
|
Owl
|
|
|
Wednesday 19 May
|
Day
|
|
|
Wednesday 19 May
|
Swing
|
|
|
Thursday 20 May
|
Owl
|
|
|
Thursday 20 May
|
Day
|
|
|
Thursday 20 May
|
Swing
|
|
|
Friday 21 May
|
Owl
|
|
|
Friday 21 May
|
Day
|
|
|
Friday 21 May
|
Swing
|
|
|