User talk:Jixie Zhang
From PREX Wiki
Revision as of 09:02, 11 June 2010 by Jixie Zhang (talk | contribs)
PREx TODO List:
The following tables show the auxiliary measurements for the remainder of
PREx.
This will be discussed at the
June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.
The plans belong to 3 categories of priority:
- Plans we MUST perform.
- Plans we'd LIKE to perform, but lower priority.
- Plans we MAYBE want to do (very low priority).
Plan |
Duration |
Personnel |
Blinded Tube Test |
4 hours (access) |
D. McNulty, K. Kumar, J. Wexler |
Further Current Calibrations with PREx Det |
2 hours |
Z. Ahmed |
Beam-Induced Linearity Studies |
2 hours |
K. Kumar, K. Paschke, R. Silwal |
High Statistics Lead Inelastics |
3 hours |
R. Michaels |
Plan |
Duration |
Personnel |
Oversampling by 2 at 120 Hz |
few days |
setup by experts |
Q2 with GEMs |
6 hours |
S. Riordan, A. Camsonne, K. Saenboonruang |
Backgrounds: Dipole Scan, up and down |
6 hours |
D. McNulty |
Transverse Polarization Running |
8 hours |
setup: J. Grames |
Plan |
Duration |
Personnel |
Further 10 nA Cavity Monitor Tests |
4 hours |
Z. Ahmed, R. Michaels |
More Moller Commissioning |
12 hours |
Moller crew (note Sasha is leaving town) |