Daily Run Plan

Here are details of the daily run plan. See also the Global Run Plan. The person responsible should ensure that a crew of experts is available for the shift. This schedule will be updated frequently by the Run Coordinator as the situation on the ground changes.

Previous daily run plans can be found here PreviousRunPlanDaily


Daily Run Plan for PREX   (latest at bottom)
Date (2010) Shift ---------- Activity (Responsible) ---------- --- Status ---
Monday 7 June Owl
  • Production
Monday 7 June Day
  • Moller Measurement (noon to 4pm)
  • Big Change asymmetry run
  • Production
Monday 7 June Swing
  • Production
Tuesday 8 June Owl
  • Production
Tuesday 8 June Day
  • Production
  • Wien Flip (9 AM)
  • Beam study (9-11 AM)
Tuesday 8 June Swing
  • Production
Wednesday 9 June Owl
  • Production
Wednesday 9 June Day
  • Production
Wednesday 9 June Swing
  • Production
Thursday 10 June Owl
  • Production
Thursday 10 June Day
  • Production
Thursday 10 June Swing
  • Production
Friday 11 June Owl
  • Production
Friday 11 June Day
  • Production
  • Wien flip
Friday 11 June Swing
  • Production
Saturday 12 June Owl
  • High Statistics Lead Inelastics, Qsq|GEM test, Calibration of the cavities with the amplifier
all done
Saturday 12 June Day
  • Backgrounds: Dipole Scan, Transverse Polarization Measurements.
Finished left dipole scan, right dipole scan is pending
Saturday 12 June Swing
  • Transverse Polarization Measurements. Carbon
Sunday 13 June Owl
  • Transverse Polarization Measurements. Lead
Sunday 13 June Day
  • Transverse Polarization Measurements. Lead

4494 32k (beam current stepping up, might not be good) 4495 78k 4496 73k 4497

Already took 580K multiplets, 60K of them may not be good data
Sunday 13 June Swing
  • If right Q2 fixed, take 100K more A_T data then go back to production. Otherwise go back to single arm production
Monday 14 June Owl
  • Continue Transverse Polarization Measurements. Blinded tube test
Monday 14 June Day
  • Production

Remaining auxiliary measurements

  • PREx det. current calibrations (Monday swing)
  • Finish dipole scan (Tuesday owl)
  • Oversampling by 2 at 120 Hz (put off/cancelled)
  • Beam induced linearity studies (put off/cancelled)
  • Q2 measurements (relative using T5 during dipole scan)
  • MOLLER commissioning (if can't do anything else - need repair? - see Jixie or Roman)
Monday 14 June Swing
  • Production
  • PREx det. current calibrations and large charge asymmetry run (Luis/Rupesh, ~1 hr)
Tuesday 15 June Owl
  • Production
  • Finish dipole scan (Bob/Jon ~2 hrs)
Tuesday 15 June Day
  • Beam Studies

expected to deliver beam to Hall A - NO AUTOMATIC ACCESS

  • Production
Tuesday 15 June Swing
  • Production
Wednesday 16 June Owl
  • Production
Wednesday 16 June Day
  • Production
Wednesday 16 June Swing
  • Production
Thursday 17 June Owl
  • Production
Thursday 17 June Day
  • Beam Studies (not discussed yet)
  • Production
  • Wien Flip
Thursday 17 June Swing
  • Production
Friday 18 June Owl
  • Production
Friday 18 June Day
  • Production
Friday 18 June Swing
  • Production
Saturday 19 June Owl
  • Production
Saturday 19 June Day
  • Production
Saturday 19 June Swing
  • Production
Sunday 20 June Owl
  • Production
Sunday 20 June Day
  • Production
Sunday 20 June Swing
  • Production
Monday 21 June Owl
  • Production
Monday 21 June Day
  • Production