Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Comments/Status
Monday, Jan 6 Owl
Day
Swing Moller Lock, FFB low current, Optics Raster Iy issue resolved, all same as Dec.
Tuesday, Jan 7 Owl Optics Larm det ul base replaced
Day Mott, Spin Dance Vac gauge readout 1-e12, vac adjacent fine (not urgent, to be fix later)
Swing Spin Dance, 150uA to dump Experts: (Simona, Eric) , (Caryn, Devi)
Wednesday, Jan 8 Owl 150uA, bcm/det calibration, damping measure, bmw initialization...production Experts: Caryn, Devi, Ye
Day Hall Access, fix compton T controller. OPS down:RF recovery, NL RF cav gradient, energy loss, broken klystron, failed arc det.
Swing Experts: Compton(Dave, Adam, Amali), BMW(Ye,Victoria,Caryn)
Thursday, Jan 9 Owl Low current BMW tune 1H01 test Couldn't send beam due to compton rates
Day halld laser inj access, bleedthrough B into A injector work prebuncher, chopper.
Swing compton tuning through chicane...but match into hall was wrong.
Friday, Jan 10 Owl Tuning match into Hall
Day "Production", injector adjustment
Swing compton chicane tuning, commissioning . Else, BMW 1H01 tune, production Don's Run Plan
Sat Jan 11 Owl compton chicane tuning, commissioning . Else, BMW 1H01 tune, production Don's Run Plan
Day compton chicane tuning, commissioning . Else, BMW 1H01 tune, production Don's Run Plan
Swing compton chicane tuning, commissioning . Else, BMW 1H01 tune, production Don's Run Plan

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history CREX
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting