WAC Notes February 4 2020
From PREX Wiki
Revision as of 17:55, 5 February 2020 by Weibin (talk | contribs) (→Production Run List - Slug 130 - IHWP IN - Flip-RIGHT - Production)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 3 2020 << >> WAC Notes February 5 2020
February 4 2020
Daily Meeting BlueJeans
Production Run List - Slug 128 - IHWP IN - Flip-RIGHT - Production
continue slug 128 from February 3:
- Good - Run 6185
Production Run List - Slug 129 - IHWP OUT - Flip-RIGHT - Production
start this slug at 03:25
- Good - Run 6186: there is an outlier in atr2
- Good - Run 6187
- Good - Run 6193
- Good - Run 6194
- Good - Run 6195
- Calibration - Run 6196
- Calibration - Run 6197
- Calibration - Run 6198
- Need Cut - Run 6201
- Good - Run 6202
- Good - Run 6203
- Good - Run 6204
Production Run List - Slug 130 - IHWP IN - Flip-RIGHT - Production
start this slug at 18:35
- Good - Run 6205
- Need Cut - Run 6206
- Good - Run 6207
- Good - Run 6208
- Good - Run 6209
- Need Cut - Run 6210
Non-Production Runs and Bad Runs
- BPM calibration: 6196
- apos UV scan: 6197
- helicity magnet scan: 6198
- PITA scan: 6199, 6200
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- run 6182 -- there is large beam excursion in this run, cut leave only about 400 patterns, just flag it as junk
- BMW coil6's amplitudes has been increased since run 6203
- the current of slug 130 is limited to 135 uA
- it looks like the energy slope is decreasing
- in slug 130, the yield of atl1 decreased by 1%