RunPlanDaily CREX

From PREX Wiki
Revision as of 01:02, 6 February 2020 by Cornejo (talk | contribs)
Jump to navigationJump to search



CREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Comments/Status
Mon Feb 3 Owl production
Day (Hall C spin dance) (Hall C spin dance)
Swing
Tue Feb 4 Owl
Day
Swing
Wed Feb 5 Owl
Day
Swing Moller was scheduled, but postponed

Restored beam all shift (BLA calibration, Ion Chamber calibrations)

Thu Feb 6 Owl Production
Day Production
Swing Production (until 8 PM)

Moller (starting at 8 PM)

Fri Feb 7 Owl Moller
Day
Swing
Saturday Feb 8 Owl
Day
Swing
Sunday Feb 9 Owl
Day
Swing

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history CREX
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting