WAC Notes January 26 2020

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 25 2020 << >> WAC Notes January 27 2020

January 26 2020

Daily Meeting BlueJeans

Production Run List - Slug 118 - IHWP IN - Flip-RIGHT - Production

  • Good - Run 5942 - looks mostly OK, but the BCM has lots of outliers and ~1.2 ppm mean, so it should be reinvestigated later
  • Good - Run 5943
  • Good - Run 5944
  • Good - Run 5950 - cut out 165000: for LQ1 trip
  • Good - Run 5952 - Back to full production
  • Good - Run 5953
  • Good - Run 5954
  • Good - Run 5955
  • Good - Run 5956 - beam drifts at the beginning. Looks OK
  • Good - Run 5957 - 9% residual Aq correlation, but its in the noise I guess

Non-Production Runs and Bad Runs

Lots of junk runs over the last few slugs, due to lots of tuning by Ops to be confident sending beam

  • Ca40 - Run 5948 - Ca40, slow current ramp, not much good data
  • Ca40 - Run 5949 - Ca40, slow current ramp, not much good data
  • Good, but very short and 1 Arm - Run 5950 - cut out ALL for LQ1 trip

Pedestal/Calibrations Updates

Issues

  • Everything:
    • BCMs read crazy stuff for Hall A laser/electronics (not other hall's beams): https://logbooks.jlab.org/entry/3770663
    • Ion chambers are a whole ordeal now
    • Ops can barely deliver 150 uA + other halls

Updates