WAC Notes January 31 2020

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 30 2020 << >> WAC Notes February 1 2020

January 31 2020

Daily Meeting BlueJeans


Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production

continue slug 121 from January 29:

  • Good - Run 6085
  • Need cut - Run 6086: large bcm asym due to issue in the injector, cut out events whose asym_bcm > 500 ppm
    • Later: decide to remove cut (not a big deal), marked as good
  • Need cut - Run 6087: same as run 6086
    • Later: decide to remove cut (not a big deal), marked as good
  • Good - Run 6089
  • Good - Run 6090

Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

start the new slug at ~ 7 am

continue slug 122 on February 1

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

BeamMod Commissioning calibration runs: 6076 - 6084

Issues

  • There are some issues in the injector, resulting in large bcm asym in two runs (6086, 6087)
  • run 6087: after cut, there are still some miniruns with large injector asym in asym_bpm2i01WS, should I cut them out?
  • quite large bcm asym (324 ppm) in run 6099, don't know why. the asym in injector asym_bpm2i01WS is quite large: -8.67 compare to grand average value (< 5ppm)
  • slug 122: quite large asym. in bpm2i01WS_mean: -7.127 (usually < 5) ppm

Updates