WAC Notes March 16 2021
From PREX Wiki
RCDB | HALOG | HAPLOG | DocDB | Online Prompt | BlueJeans Link | Runlist spreadsheet, respin 1 spreadsheet |
---|
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << WAC Post-Run_Meeting Notes
WAC Notes March 9 2021 << >> WAC Notes March 23 2021
Organization
Date and time: March 16, 2021, 11am
Bluejeans ID: 564945377
Meeting link: https://bluejeans.com/564945377
Runlist spreadsheet
March 16th 2021
- Beam off pedestals (for PMT devices) - needs another pass - HAPLOG
- Seems like a good idea to use bcm_dg_us.hw_sum_raw/num_samples < -150 or so (spot check 20 runs across CREX)
- Also look at 1D histogram of BCMs
- Commit remaining map/cut updates from giant spreadsheet work
- Update pedestal maps with beam off pedestals, and double check values are all appropriate (Amali, Robert, Cameron)
- Update RCDB info
- Consider adding bmod slope map files for respin2
- Aim for Friday afternoon initial respin2 test slugs (need to make sure folders and disk usage are all in line too)
- Getting slug lists and such polished can happen after the respin is underway
March 9th 2021
Preparing for respin2 - mid March - 1 week from now
- Runlist finalization
- Finish up runlist checking here
- Aq issues and BPM 12X cut ranges
- Github up to date
- Apply RCDB updates
- We need a standard set of cuts and procedure for getting slug lists, which can be deliberated after respin2 begins
- Pedestal updates
- Use beam off for non-RF systems (does AT data need to have changed pedestals? At least double check them all)
- Verify segmentation and values for RF systems
- Refer to beam off pedestals for guidance on applicability ranges
- Double check PITA scans from respin1 data and BPM calibrations separately
- Aq shift - solved
- Questions on AT data-set (similar to Aq issue)
- Run 8321 config file for file splits?
- Add combos to mulc and regression for main detector + AT combos (usl_atl1_dd, etc.)
- Include SAMs and ATs in BMOD calculations going forward
March 2nd 2021
Preparing for respin2
- Pedestals/new beam trip cut/Aq interrelation question
- Aq post-trip studies: http://ace.phys.virginia.edu/HAPPEX/4483
- Things look good when comparing the different time slices post-trip recovery - more plots are needed to determine how well the non-feedback data post-trip explains the shift in Aq from prompt to respin1 data set.
- Pedestal comparisons for AT: http://ace.phys.virginia.edu/HAPPEX/4482
- Changing from prompt (wrong) to respin1 (relative to bcm calibrated) pedestals changed the mean asyms by an expected ~3% per target, EXCEPT for Pb208, which changed by ~15%. This needs further investigation to understand why Pb pedestal change affected the asyms so much.
- Aq post-trip studies: http://ace.phys.virginia.edu/HAPPEX/4483
February 23rd 2021
Prior day's notes can be found here
Attendence
Cameron, Victoria, Paul King, Allison Zec, Juliette, Weibin, Ryan, Devi, Kent