PREX/CREX Aug 15, 2018 10:00am

From PREX Wiki
Revision as of 14:33, 14 August 2018 by Ciprian Gal (talk | contribs)
Jump to navigationJump to search

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  627 455 790
 Bluejeans link: https://bluejeans.com/627455790
 Offline room:   CEBAF Center L210A

Agenda

  1. Status:
    • CG: the septum coil has arrived, however there is no firm plan of when to assemble it (due to cooldown work going on right now) and lack of space. Jessie is working with Thia to find enough space for APEX magnets that require more work (they are they priority since they are up next) and for us as well.
    • CG: the dump pipe is being worked on now. Both flanges have been welded back and the plan is to have the work complete by the end of this week.
    • CG: Thia is considering to run Hall A between 5th and 9th of Sept with any target except the tritium. They are going to form a plan on Wed, but if we have something we could do parasitically, or dedicated we should speak up.
  2. topic
    • comments

Present

Excused

Kent P, Paul K, David A, Amali P, Dave G,