DAQ Testing/20181111

From PREX Wiki
Revision as of 17:51, 11 November 2018 by Cameronc (talk | contribs) (Created page with "Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes File:Ti...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes

Old-Example Timing Diagram, Injector, FLEXIO - Contains all Helicity Signals

Previous Day of Testing << >> Next Day of Testing

November 6th, 2018 Testers: Bob, Cameron, Paul King, Amali

See Today's Meeting Notes

Goals

Fix the timing in the FLEXIO so that it latches LNE after the events are read out (at least ~1us after Tstable, can use 112 VQweak wait signal) instead of right at Tstable as it was

FLEXIO Scaler

New setting, delays FLEXIO latch LNE

Was, as of 11/6/2018 test

The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with Tstable was used to latch LNE

  • Channel 0 = HEL+
  • Channel 1 = HEL-
  • Channel 2 = MPS/QRT/MultiSync
  • Channel 4 = Pair Sync
  • All channels are the standard helicity information with no surprises
  • Old-Timing Diagram, Injector, FLEXIO

Results

To Do