20190403-Analyzer-Mtg
From PREX Wiki
Jump to navigationJump to searchBack to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- runlist
- What do we need to do before we're ready to respin all of the concurrent running
- New param files from operations are merged into develop, and stability/beam-trip cuts are working "better". See HAPLog/3708 for beam trip performance.
- Did we get all the param file changes into operations that we had planned?
- Possible other merges:
- Pair analysis: tree production is working, do not yet have pair-based running sums
- Prompt summary: Basic functionality is there, but formatting needed work.
- Aggregator: Is this ready to be used on the respun runs?
- Post-pan regression: Is this ready to be used on the respun runs?
- Do we have a "process a run" analysis chain ready? Do we want to set it up as a script?
- New param files from operations are merged into develop, and stability/beam-trip cuts are working "better". See HAPLog/3708 for beam trip performance.
- What do we need to do before we're ready to respin all of the concurrent running
cd rootScripts/aggregator source setup_camguin.tcsh ./panguin_wrapper.sh -r <run_number> -f analyze.cfg -n 1
- "Operations" branch
- Pull requests
- online plots
- pair analysis
- regression analysis
- feedback
- Green Monster
- VQWK adcs
- DAQ issues
- Event mode DAQ status
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed
- PK was going to send an email with ideas, but hasn't
- Event mode DAQ status
Bob's DAQ tasklist
TO-DO list for Parity DAQ updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13 Tao & Cameron: 8, 9 Bob: 3, 6, 10 Cip, Cameron, Tao: 13 1 Doing - Timing: mostly understood, still small mysteries (LNE) 2 Doing - Synchronization-check system. w/help from Ed Jastrzembski 5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals 6 Clean up CRL -- eliminate so-called "dirty trick" 7 Check the 7200 scaler setup at injector, find a spare 7200. 8 Doing - Pedestal studies, aka cross-talk. 10 Green Monster maintenance. 11 Doing - Test spares. Repair bad modules. 12 Doing - Document everything. Circuit diagrams, cable map, "how to". 13 Online software, a bit undefined since software is changing. (a) automatic production of run-dependent database (b) alarms like end-of-run voice (Bob) (c) feedback (d) coil-pulsing aka modulation aka dithering (Victoria) (e) panguin (GUI showing real-time plots) (f) prompt analysis (g) e-logbook entries (h) archiving EPICs data