20190417-Analyzer-Mtg

From PREX Wiki
Revision as of 11:44, 17 April 2019 by Paulmking (talk | contribs)
Jump to navigationJump to search

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. respin of APEX runs: runlist
    • What output do we have?
    • Agregator?
    • Pair tree plots?
    • Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script.
  2. "Operations" branch
  3. regression analysis
  4. feedback
  5. Beam modulation
  6. VQWK adcs
  7. EPICS run-start and fast logger (and EPICS decoder to slow tree)
  8. bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
  9. Bob's DAQ tasklist
    • Timing: mostly understood, still small mysteries (LNE)
      • PK: we restructured the timing between the injector and CH crates.
    • Synchronization-check system. w/help from Ed Jastrzembski
      • Cameron working on.
    • Clean up cabling, labels, fasteners - First need to examine all signals
      • CH crate has a preliminary cleanup and Caryn is doing
    • Clean up CRL -- eliminate so-called "dirty trick"
      • ??
    • Check the 7200 scaler setup at injector, find a spare 7200.
      • Talked to Bob related to timing. Event counters
    • Pedestal studies, aka cross-talk
      • Tao will look into it soon.
    • Green Monster rework: Adam.
      • AZ: having a separate issue from bmw.
    • automatic production of run-dependent database
      • Sanghwa is working on this.
    • alarms like end-of-run voice
      • later
    • e-logbook entries
      • later
    • Document everything. Circuit diagrams, cable map, "how to".

Present

Excused