DAQ Testing/Run List

From PREX Wiki
Revision as of 15:48, 25 April 2019 by Cameronc (talk | contribs)
Jump to navigationJump to search

Further DAQ Documentation is listed at the DAQ Documentation Portal and DAQ Testing links

Also see Testing and Commissioning Notes for a detailed description of tests.

DAQ Testing and Commissioning Run List

This is a compilation of runs taken during testing and commissioning of the DAQ before Prex/Crex

Summer 2018

Run list - Cameron and Chandan
Day Run Number Purpose
July 28 2018 4040-4067 Testing R HRS ADC Channels
July 29 2018 4068-4104 Testing L and R HRS ADC Channels
and Counting House channel debugging
July 30 2018 4107-4115 Fixed control.db, Counting House channel debug
4116-4121 Replaced bad vqwk ADCs in counting house crate

Fall 2018

Run list - Cameron, Ye, Bob
Day Run Number Purpose
October 23 2018 4444-4465 Cameron tests ET deatime
October 24 2018 4473-4501 Cameron tests ET deatime
October 29 2018 4503-4528 Cameron tests ET deatime
November 1 2018 4533-4542 Cameron and Ye check on cavity ADC signals
November 2 2018 4548-4554 Cameron tests ET deatime
November 5 2018 4556-4566 Cameron tests ET deatime
November 6 2018 4568 Cameron and Bob test injector timing
November 11 2018 Injector: Paul King adjusts FLEXIO timing
Injector: Caryn fixes control.db
November 14 2018 4611-4614 Injector: Cameron checks on SIS3801 timing
4615-4617 Counting House: Ye and Cameron test CntHouse ADCs again
November 21 2018 4631-4642 MCC High Current test HALOG
November 27 2018 4662-4680 Cameron tests Injector timing delays (4663 helicity benchmark)
December 2 2018 4685-4695 Cameron tests Injector timing delays (4686 helicity benchmark)
December 3 2018 4669-4700 Cameron tests CntHouse ET deadtime (4700 is a long benchmark run, no beam)
December 5 2018 4706-4742 Cameron tests CntHouse ET deadtime (4742 is a benchmark run, no beam)
December 17 2018 4776-4812 Cameron tests CntHouse ET deadtime, makes conclusions
December 19 2018 4813-4817 Cameron tests Banked CRL in injector timing, and BMW commissioning
December 21 2018 4818-4822 Cameron tests new RHRS scaler in PREX config, reads data, incorrectly

Spring 2019

There was a change of configs, now we have all Banked configs and reset the run number to 1000

Run list - Cameron, Ye, Bob, Tao
Day Run Number Purpose
January 15 2019 1017-1031 Cameron and Tao test synchronization monitor
January 18 2019 1032-1036 Cameron tests pedestals with 1.6 V battery in ADC channels
January 22 2019 1039-1044 and 1098 Testing synch monitor with new setup with Paul King
January 22 2019 Swing 1045-1097 Injector PQB Studies
January 23 2019 1100-1104 Testing JAPAN ET online connection and BMW FLEXIO functionality
February 1-3 2019 1105-1192 Injector studies
February 04 2019 1193 Testing CODA, JAPAN, PANGUIN, and compiled analysis scripts + SAM channel noise floors
February 05 2019 1194-1198 Establishing standard DAQ procedure and HV GUI
February 06 2019 1199-1211 Testing SAMs and ET
February 07 2019 TEDf Test Stand Initiating the TEDf test stand
February 12 2019 Debugging the HelBoard
February 13 2019 Debugging the HelBoard and ADC Testing in TEDf stand
March 14 2019 Understanding Beam Sync some, cataloging understanding of helicity control
March 22 2019 ET Speed limit tests
April 04 2019 ET Speed limit tests