Optics and Q2
- Energy Measurement (Doug) (non-invasive)
- Priority High
- Can be performed Day shift Monday or Tuesday?
- look for 1e-3 accuracy. Non invasive.
- Optics Data (Cip) (1-1.5 shifts)
- requires access to prepare, about 8-10 hrs data, access to backout
- Sieve in, VDC data. thin Carbon
- about 500k per run
- use target lock, about 1 uA
- no raster
- Does not (strictly) require counting mode quartz detectors
- Beam position dependence Completed. (Got +/- 3mm)
- shift beam +/- 4mm in horizontal , retake dp = 0 optics
- Vertical beam position dependence Completed
- shift beam +/- 2mm in horizontal , and +/-3mm in vertical.
- Used both thick and thin C targets due to small thin target size
- Target Z comparison Completed
- use 90 degree Carbon target, Compare y-targ reconstruction to 45 degree carbon target
- Retake Optics Data (Cip) (Completed)
- including dp = 0, +-1% (scale all magnets)
- Dynamic Thermal-Induced Density Rearrangement (Bob, Chandon, Siyu, Cip) (4 hours)
- High Priority (unless we can measure significant density variation at low current)
- requires access to prepare, 3 hrs data + analysis, access to backout
- Sieve in. S0 on, GEMs on, VDC Off. Production raster.
- Does not require counting mode in quartz detectors _except_ for actually measuring Q2
- 1uA
- Pb10
- Measure scattering density over target x vs y
- 70uA
- Repeat measurement of scattering density over target x vs y
- If different, do the same on a pristine target
- Evaluate Q2 (for specific sieve holes?) in each case
- Cavity vs Striplines (Cip) (~1.5 hrs) summary
- High Priority
- measure carbon hole location with 50nA cavity lock and spot++
- measure carbon hole with 0.5uA tgt lock and spot++
- show these are the same, within a 1mm or so
- Final Q2 measurement (Bob, Chandon, Siyu, Dustin) (4 hours?)
- Priority (?)
- Repeat of Q2 measurement, with improved pedestal noise control. Requires long (1hr +) access to reduce noisy pedestals
- Detector counting mode.
- S0 trigger
- Lead target
- production raster and beam position
- Use cavity lock, low current
- VDC/GEM Rate study (Bob, Chandon, Siyu)
- Completed (awaiting results)
- Requires access, 3 hrs data, access to back out
- Detector counting mode.
- S0 trigger
- Lead target
- production raster and beam position
- Use cavity lock, low current
- start at low S0 rate (50kHz?) and go up in rate to 500 kHz, in several steps (50, 100, 200, 500 kHz)
- turn off VDC, continue up to 2MHz rates in GEMs (1MHz, 2MHz)
- Compare Q2 measurements at each rate from GEMS and VDC to look for rate dependence
- Q2 from damaged target (Bob)
- Completed (awaiting results)
- measure Q2 from most damaged target (Pb10?)
- compare to Q2 from pristine target
- If these are different - we need a plan to correct for damage or measure all used targets
- can be combined with previous study, add 1 hr for target move and measurement
Backgrounds
- Stubby Quartz / Blinded Quartz (Dustin) (4 hours?)
- Very High priority. Wednesday Swing? Thursday Day?
- Longish access to setup and back out, but short data taking period (production conditions).
- Replace detector quartz with superelastic stub or blinding cap (alternate US/DS and L/R)
- Integrating measurement. Could normalize increased gain just by lowering beam current in production condition.
- If surprising results found, continue test or plan second test
- Rescattering measurement (Bob, Cip?) (~1 shift)
- High Priority
- repeat of previous measurements, but new optics and a crucial cross-check
- Detune spectrometer up in momentum, to dump elastic peak into spectrometer wall.
- Measure (integrating mode) signal in main detectors. Requires HV boot leg to get higher gain (is 10x possible?)
- should scale all spectrometer magnets _except_ Q3.
- Thin Lead Target to check for inelastics at high-resolution (Bob) (~1.5 hour, including setup/backout)
- Medium Priority Do if we can.
- valuable illustration and cross-check for presentation/publication
- Does NOT require detector counting mode - could be done anytime with low current running
- Pole tip re-scattering (Bob, Cip?)
- Requires investigation or planning - do we have an idea here?
- Q2 or septum mis-tune, to increase interception on pole tip and improve poletip rescattering estimate
- A_T detectors (Dustin)
- Significant asymmetries found in A_T detectors, requires investigation and planning
- Thin C12 to measure diamond background spectrum? (Bob)
- All our optics data was taken with this, so presumably we have enough for this measurement already
- Thick C12 to measure diamond background fraction? (nope - priority none)
- I'm unclear on the value of this, since we are not set up terribly well for yields at very different rates, the radiation is so different, and I don't know how accurately the targets are known.
Detectors
- Linearity Studies (PITA + current scans) (Caryn)
- These are ongoing - should continue regularly. ~ 1 hour every 3 days.
- Linearity LED tests
- This will be studied off line
Other
- Sign check
- run Moller, Compton, and parity DAQ for quick PITA scan
- Have we already done this? Parasitic with any PITA scan
Moller polarimetry
- Repeat measurements
- about 2x/week. Goal: 1-1.5 shifts per measurement.
- need enough granularity to track changing polarization.
- IHWP IN/OUT
- Copper false/asymmetry
- Target uniformity
Compton polarimetry
- No-target runs
- Laser polarization optimization
- Laser polarization flip
- linearity studies