WAC Notes January 29 2020

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 27 2020 << >> WAC Notes January 30 2020

January 29 2020

Daily Meeting BlueJeans

Production Run List - Slug 121 - IHWP OUT - Flip-RIGHT - Production

  • Good - Run 5655 - Cut at 150k-170k to remove beam motion (caused by 120 uA running)

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • FFB and orbit locks seem to be breaking, so there is no beam delivery for now

Updates

  • New sign corrected Grand Agg plots have been added to the WAC toolchain (make_grand_plots.sh)
  • We still need to do 1H01 BMOD tuning
  • And we need to get a fresh calibration run (which will be relevant for all data taken with the NEW target)
    • After that calibration run Ryan will likely move an AT or two (and need another calibration run)
  • Cameron is trying to get bmw corrected data into the WAC chain