WAC Notes February 2 2020
From PREX Wiki
Revision as of 16:10, 4 February 2020 by Weibin (talk | contribs) (→Production Run List - Slug 127 - IHWP OUT - Flip-RIGHT - Production)
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes February 1 2020 << >> WAC Notes February 3 2020
February 2 2020
Daily Meeting BlueJeans
Production Run List - Slug 126 - IHWP IN - Flip-RIGHT - Production
continue slug 126 from February 1:
Production Run List - Slug 127 - IHWP OUT - Flip-RIGHT - Production
this slug at about 4 am
continue slug 127 on February 3:
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
- https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
Issues
- very large asym_bpm2i01WS_mean in slug 127: ~13.8 ppm (compared to previous value of < 5 ppm)
- due to work in arc 8 box supply, no beam at all during the day and swing shift, beam comes back at about 21:30; but beam spot size tuning and compton work blocks production until 1:45 am the next day