WAC Notes February 15 2020

From PREX Wiki
Revision as of 06:59, 16 February 2020 by Adhidevi (talk | contribs) (Created page with "No production data. Waiting for HALL B pass change. We got beam into the hall only half way through the Swing shift and production quality beam only at the end of the shift.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

No production data. Waiting for HALL B pass change. We got beam into the hall only half way through the Swing shift and production quality beam only at the end of the shift.