WAC Notes February 16 2020

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes February 15 2020 << >> WAC Notes February 17 2020

February 16 2020

Daily Meeting BlueJeans


Production Run List - Slug 135 - IHWP OUT - Flip-RIGHT - Production

start this slug at the end of Swing shift, February 16 after a long down (waiting for HALL B pass change)

  • Need Cut - Run 6424
    • User_Comment says checking blinder, and marked as Junk run but is a Production run on Ca-48 target
    • ~30uA loss in 0l02 starting this run. Aq is quite large, huge excursion in 0i02 (injector clipping?) in the second half of the run
    • Larger energy slopes comparing with production running before but is at the same level where we left during A_T measurements
    • An outlier in ATL1
  • Good - Run 6427
  • Need Cut? - Run 6428
    • Only a few thousands of Good Events. Large Aq and excursion in 0i02 in the beginning
  • Good - Run 6429
  • Good - Run 6430
    • Large (~-11%) residual correlation of USL with AqUS
  • Good - Run 6431
    • 150uA and 140uA beam
  • Good - Run 6432
    • No loss in 0l02

Non-Production Runs and Bad Runs

  • run6425 is in C-Hole
  • run6426 is in C-Hole, but rcdb says "Production"

Pedestal/Calibrations Updates

Issues

Updates