WAC Notes March 5 2020

From PREX Wiki
Revision as of 09:34, 5 March 2020 by Ajzec (talk | contribs) (Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes February 16 2020 << >> WAC Notes February 18 2020

March 5 2020

Daily Meeting BlueJeans


Production Run List - Slug 152 - IHWP IN - Flip-LEFT - Production

Slug started on March 4 at approx. 2 AM.

Production Run List - Slug 153 - IHWP OUT - Flip-LEFT - Production

Slug started at approx 1:30 on March 5

Non-Production Runs and Bad Runs

  • Runs 6897 - 6908
    • Down for beam tuning, injector work, and recovery
  • Run 6912
    • Down for further injector steering

Issues

Updates