20200710-PREX2-Analysis

From PREX Wiki
Revision as of 13:49, 10 July 2020 by Ciprian Gal (talk | contribs)
Jump to navigationJump to search

Back to Main Page >> PREX2_Analysis

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: REMOTE ONLY

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE: 206 308 0414                 
 Bluejeans link: https://bluejeans.com/2063080414

Agenda

  1. Ciprian : preliminary results for transverse run spreadSheet atPlots
    • Devi:cos(phi) is from PREX-I. CG: will cross-check.
    • KK: we are not going to present An-hat (impurity corrected) next week.
    • David A: I checked - the PREx point in the original version of the paper was plotted with the error bar being total (stats + syst added in quadrature): 0.28 +- 0.25 ppm
  2. Don : Discussion on Moller result during transverse run slides
    • KK: what's the total error from polarimetry. CG: about 2% relative error.
  3. Paul: Initial look at drifts in BCM event-level difference; follow up needed. http://ace.phys.virginia.edu/HAPPEX/4162
    • TY: run 3454, the rising behaviour only happens in analog upstream BCM
    • CP: there is a power supply replacement in the BCM. Majority of the runs happen before power supply replacement.
    • GU: is there any intensity dependence. PK: No.
    • GU: is the beam current at normal run condition. PK: these runs are in typical beam current.
  4. Victoria: glance at PREX-II statistics including bmod data

Present

Adam Z, Eric K, Ezekiel W, Iris H, Quinn C, Robert R, Ryan R, Tao Y, Dimitrii N, Victoria O, Paul S, Paul K, Ye T, Chandan G, Amali P, Ciprian G, Don J, Cameron Clarke, Devi A, KK, David A, Weibin Z, Silviu CD, Jim N, Caryn P, Guido U, Dustin M, Sangwha P, Brian Q, Sakib R, Mark, Siyu J

Excused