PREX/CREX Monday, February 16, 2015 3:00pm EDT

From PREX Wiki
Revision as of 16:40, 16 February 2015 by Rakitha Beminiwattha (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Link to the Meeting page PREX/CREX Teleconferences
Last meeting: PREX/CREX Monday, February 9, 2015 3:00pm EDT

The teleconference info is as follows:
       Phone #: +1-888-240-2560 or +1-408-740-7256 and See International Numbers
       Code: 174599135

Agenda

  • Hall A Lumi refurbishment discussion by Dustin elog-2968
  • Re: Radiation Around Septum and HRS Area Electronics by Ciprian elog-2967


Present:
Paul, Ciprian,Rakitha, KK, Dustin, Kent, Guido, Seamus, Bob

Minutes


  • New Hall A DS lumi design udate, see elog 2968
  • Goal for new design is to have Qweak design implemented under hall A constraints
    • Compatibility check so far pass all the constraints except Qweak light guide is not yet checked in this new desing
  • The PMT tubes were purged in N2 due to PMT spec. requirement and to keep moisture out of the tube area.
  • Ciprian's preliminary comparison using Happex design for Radiation Around Septum and HRS Area Electronics, see elog 2967
    • This simulation was done at 1 GeV electron beam with PREX-II collimator and PREX-II fringe field
    • Next step will be to simulate at 3 GeV electron beam with PREX-I collimator and fringe field



From Last week

  • Check the PREX beam dump - Lorenzo and Rakitha
    • We may not need to keep tracks after about 3 m into the dump therefore we could add kryptonite

Misc.

  • Beam parasitic studies needs a to-do list

TO DO Lists

  • It would be nice to have real-time viewer for optics studies in commissioning (disussed in 01/16/2014 meeting)


TO DO Lists link: PREX, CREX