Agenda
Present:
Kent, KK, Seamus, Tyler, Guido, Paul, Juliette, Rakitha, Dustin, Bob
Minutes
Minutes
- Need to test CREX compatibility with PREX collimator (Rakitha, Kent, ??)
- The goal for next collaboration meeting will to converge on final design including new SC + shielding design, new SC material, collimator box material
- We need to decide materials for new SC, collimator box, and septum pipes (Al vs. steel)
- Bob will look into getting a TOSCA model for Juliette so that she can modify it include the magnetic shielding to reduce fringe magnetic field to the levels assumed in the Geant4 simulations
- Need to add collimator drop-down box and collimator disposal box at the bottom into Geant4 simulation
- If CREX is compatible with PREX collimator we will not need a collimator drop-down box
- The drop-down mechanism must be designed not to interfere with the sieve actuators
- We need to test the CREX septum current limit
- Another important item is to look in to Q1 compatibility between PREX/CREX Bob? Seamus?
- Compare angular neutron distribution in the hall for Happex similar to analysis in elog 2954
- what are prompt single event upsets due to high E neutrons for PREX vs. Happex
- Collaboration meeting time will not be in August but sometime in September not earlier than September 18th.
Misc.
- Beam parasitic studies needs a to-do list
TO DO Lists
- It would be nice to have real-time viewer for optics studies in commissioning (disussed in 01/16/2014 meeting)