PREX/CREX Monday, December 7, 2015 2:00pm EDT

From PREX Wiki
Revision as of 15:27, 7 December 2015 by Rakitha Beminiwattha (talk | contribs) (→‎Minutes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Link to the Meeting page PREX/CREX Teleconferences
Last meeting: PREX/CREX Monday, November 30, 2015 2:00pm EDT

The teleconference info is as follows:
       Phone #: +1-888-240-2560 or +1-408-740-7256 and See International Numbers
       Code: 174599135

Agenda

Present:
Rakitha, Ciprian, Bob, Seamus, Guido, Paul, Kent, Caryn, Dustin

Minutes

  • Beam update:
    • 85 uA beam to Hall A initially and remain high current for few shifts.
    • Take data while high current to check beam monitor resolution - main goal
    • Take pedestal data with current ramp zero beam in-between for beam

monitors

    • Take few runs with injector DAQ
    • Halo target studies? low current halo target calibration
      • Halo detectors are read by scalers and also fed to EPICS
  • Lumi Update
    • Need N2 hookup for lumi detectors (to remove moisture) with help from Hall A techs.

Misc.

TO DO Lists

  • It would be nice to have real-time viewer for optics studies in commissioning (discussed in 01/16/2014 meeting)


TO DO Lists link: PREX, CREX