PREX/CREX Monday, Dec 19, 2016 3:00pm EDT

From PREX Wiki
Revision as of 16:07, 9 January 2017 by Kent Paschke (talk | contribs) (→‎Logistic information)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting


ORIGINAL CALL IN FAILED. USE THE BELOW BLUEJEANS MEETING

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 PARTICIPANT CODE:                #
 JLab meeting room: "CC L207"

Agenda

  1. Scheduling - Kent:
    • KP: bad budget will mean that tritium is being pushed back (fall 2017 and spring of 2018), but we are still on track for summer/fall 2018.
  2. Optics simulation: Tyler
    • TK: haplog 3348: Nickie sent a table with calculated values and Tyler will update slide 7 accordingly.
    • TK: haplog 3350: produced plots from single electron 5 degree scattering into the LHRS. ran for different septum tune and target position. The plots show that the septum tune is not large enough for the transport y coordinate to reach 0. We should go to a weaker tune for the septum.
    • SR: the field interpolation could be badly implemented and it may be cause the kink in att4. KP: do a check around -1053 and moving the field by 1 cm or so.
    • Guido: is the HRS dipole set properly? (when we move around we should match the HRS as well). SR: we are looking at the entrance of Q1 so this study to should tell us exactly what you point out.
    • KP: this study should be done with the real magnet before we run? SR: yes. KP: we should pay attention because the beam we will receive can be up to 50 MeV off which can produce mm offsets. This would mean that we will lose acceptance.


Attendance

Chris J, Caryn P, Tyler K, Ciprian G, Kent P, Tao Y, Seamus R, Guido U

Excused:

Julliette M, Bob M,