PREX/CREX Jun 8 2017 11:00am EDT

From PREX Wiki
Revision as of 12:35, 8 June 2017 by Ciprian Gal (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting


Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 PARTICIPANT CODE:                  913380354#
 Room IRL:                            CEBAF F227


Agenda

  1. Ciprian, Dave: Dump configuration wikiPage, hallCdump, hallAdump
    • KP: send beam on aperture in simulation. and check ion chamber signal. CG: will work on it
    • KP: double check to see what the values for beam pipe are for new ones.
    • KK: make sure to have all the information before a meeting
  2. Ciprian: Q1 modeling pdf
    • SR: the rise around 60 cm is the septum, and is expected.
    • GU: we should look at this field and make sure it does not affect our optics. SR: we can tune this to make sure we get the correct optics and the deflation from the dipole imbalance between the US and DS of the quad will be minimal and in the noise.
  3. Ciprian: RSAD for beam schedule request
    • CG: working on RSAD for beam request and will coordinate with RadCon to get the document ready before the deadline.

Attendance

Kent P, Caryn P, Adam J, Tyler K, Bob M, Seamus R, Paul S, Mark P, Sanghwa P, Guido U, KK, Cameron C,

Excused:

Dave G, Silviu D, Victoria O,