PREX/CREX Sep 25, 2018 10:00am

From PREX Wiki
Revision as of 10:23, 25 September 2018 by Ciprian Gal (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  555 144 462
 Bluejeans link: https://bluejeans.com/555144462
 Offline room:   CEBAF Center F324-325

Agenda

  1. ELOG:
    • AZ: swapping the elog computer after the meeting. Should be back soon after the meeting.
  2. SAM design
    • YT: the stress on the SAMs with COMSOL is very small compared to the breaking point. DM: this looks solid, we are just making sure that the simulation takes everything into account. SR: intuitively I can see how the simulation may have problems producing an unstable solution.
    • BM: can they be easily damaged during install? DM: no plan to touch the sides and plan to be very careful. SR: we plan to have one of these to test and procedure or installation tool.


Present

Cameron C, Bob M, Sanghwa P, Paul K, Seamus R, Ciprian G, Eric K, Kent P, Adam Z, Amali P, Jinlong Z, Victoria O, Devi A, Dustin M, Chandan G, Silviu D, Rich H, Ryan R, Tao Y, David A, Guido U, Paul S, Ye T, KK, Juliette M,

Excused

Dave G