DAQ Testing/20181111
From PREX Wiki
Revision as of 17:51, 11 November 2018 by Cameronc (talk | contribs) (Created page with "Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes File:Ti...")
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
November 6th, 2018 Testers: Bob, Cameron, Paul King, Amali
Goals
Fix the timing in the FLEXIO so that it latches LNE after the events are read out (at least ~1us after Tstable, can use 112 VQweak wait signal) instead of right at Tstable as it was
FLEXIO Scaler
New setting, delays FLEXIO latch LNE
Was, as of 11/6/2018 test
The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with Tstable was used to latch LNE
- Channel 0 = HEL+
- Channel 1 = HEL-
- Channel 2 = MPS/QRT/MultiSync
- Channel 4 = Pair Sync
- All channels are the standard helicity information with no surprises
- Old-Timing Diagram, Injector, FLEXIO