20190327-Analyzer-Mtg

From PREX Wiki
Revision as of 17:01, 26 March 2019 by Ciprian Gal (talk | contribs) (Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. runlist
    • What do we need to do before we're ready to respin all of the concurrent running
      • Look at the event cuts---Tao
      • SAM pedestals---Tao and Devi (Tao has found different beam-dependent pedestals, should we use those or just the beam-off peds?)
      • Do we need to mess with beamline pedestals? Not for this pass.
      • We'd like to have a run-summary tree---Cameron
      • We want to have the post-pan regression feeding in into the run-summary tree (or friend-able)---Cameron
  2. "Operations" branch
  3. Pull requests
  4. online plots
  5. pair analysis
  6. regression analysis
  7. feedback
  8. Aggregation
  9. VQWK adcs
  10. DAQ issues
  11. bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed
  12. greenmonster: there needs to be ways to set all the VQWKs/timing boards/etc consistently.
  13. Other issues

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Doing - Timing: mostly understood, still small mysteries (LNE)
2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Doing - Pedestal studies, aka cross-talk.  
10 Green Monster maintenance.
11 Doing - Test spares.  Repair bad modules.
12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data


Present

Excused