20190410-Analyzer-Mtg
From PREX Wiki
Revision as of 13:47, 10 April 2019 by Ciprian Gal (talk | contribs)
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- respin of APEX runs: runlist
- What output do we have?
- TY: high current with SAMs on have been respun for 50 and 40 uA runs.
- TY: right now we look at the noise for BPMs and SAMs.
- KP: would you know if all the events are processed? TY: will figure out how to best do that. SR: if the prompt summary exists then it finished.
- KP: the prompt summary text output should also be investigated.
- TY: we used the ds3x bcm to normalize the SAMs
- CG: we should take a look at Caryn's panguin file. TY: will do
- Agregator?
- CG: SR and CG will take a look at Cameron's code.
- Pair tree plots?
- TY: working on pair tree plots and post-pan regression with pairs.
- Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script.
- TY: we have a basic script. PK: there are Qweak examples for watching files in the directories that we copied over to adaq.
- KP: the shift crew should check the basic quality of the data output.
- What output do we have?
- "Operations" branch
- PK: Tao updated files and committed and I pushed them to the repo.
- regression analysis
- PK: we are pretty close to having a working copy of the data handler. Still on track to have a regression analysis working by the end of April.
- feedback
- KP: could feedback hang off the data handler? PK: Amali should have a discussion with Paul, because there should not be that much restructuring to implement feedback.
- Beam modulation
- CG: will follow up with Victoria.
- VQWK adcs
- CG: all working.
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- RR: updated both of them (removed the non-working EPICS variables). Organized the fastLogger.
- bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
- PK: the bmwClient doesn't get data from CODA. My intention is to add variables to the BMW client that are written at pre-start, end of run, and download.
- Bob's DAQ tasklist
- Timing: mostly understood, still small mysteries (LNE)
- PK: we restructured the timing between the injector and CH crates.
- Synchronization-check system. w/help from Ed Jastrzembski
- Cameron working on.
- Clean up cabling, labels, fasteners - First need to examine all signals
- CH crate has a preliminary cleanup and Caryn is doing
- Clean up CRL -- eliminate so-called "dirty trick"
- ??
- Check the 7200 scaler setup at injector, find a spare 7200.
- Talked to Bob related to timing. Event counters
- Pedestal studies, aka cross-talk
- Tao will look into it soon.
- Green Monster rework: Adam.
- AZ: having a separate issue from bmw.
- automatic production of run-dependent database
- Sanghwa is working on this.
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Document everything. Circuit diagrams, cable map, "how to".
- Timing: mostly understood, still small mysteries (LNE)
Present
Tao Y, Ciprian G, Adam Z, Kent P, Sakib R, Robert R, Devi A