20190417-Analyzer-Mtg
From PREX Wiki
Jump to navigationJump to searchBack to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- respin of APEX runs: runlist
- What output do we have?
- Agregator?
- Pair tree plots?
- Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script.
- What output do we have?
- "Operations" branch
- regression analysis
- feedback
- Beam modulation
- VQWK adcs
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
- Bob's DAQ tasklist
- Timing: mostly understood, still small mysteries (LNE)
- PK: we restructured the timing between the injector and CH crates.
- Synchronization-check system. w/help from Ed Jastrzembski
- Cameron working on.
- Clean up cabling, labels, fasteners - First need to examine all signals
- CH crate has a preliminary cleanup and Caryn is doing
- Clean up CRL -- eliminate so-called "dirty trick"
- ??
- Check the 7200 scaler setup at injector, find a spare 7200.
- Talked to Bob related to timing. Event counters
- Pedestal studies, aka cross-talk
- Tao will look into it soon.
- Green Monster rework: Adam.
- AZ: having a separate issue from bmw.
- automatic production of run-dependent database
- Sanghwa is working on this.
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Document everything. Circuit diagrams, cable map, "how to".
- Timing: mostly understood, still small mysteries (LNE)