20190424-Analyzer-Mtg
From PREX Wiki
Jump to navigationJump to searchBack to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
- respin of APEX runs: runlist
- What output do we have?
- CC will begin on the 30 uA runs
- Agregator
- Sakib had run the aggregator for the uncorrected trees. He also has regressed values in the aggregator tree.
- Sakib says that for adding the values from the "mulc*" trees, we would need to have the "mul" and "mulc*" friended together.
- Pair tree plots?
- Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script.
- What output do we have?
- "Operations" branch
- Uncommitted changes
- Parity/prminput/#prexCH_beamline_eventcuts.1356-1423.map#
- Parity/prminput/prexCH_beamline.1572-.map
- Parity/prminput/prexCH_beamline.Carynfix.map
- Parity/prminput/prexCH_helicity.1588-.map
- Parity/prminput/prexCH_helicity.1593-1595.map
- Parity/prminput/prexCH_scaler.1588-.map
- Parity/prminput/prex_sam_pedestal.1635-.map
- Parity/prminput/prex_scaler.1588-.map
- Parity/prminput/prexinj_beamline.1572-.map
- Uncommitted changes
- Recent branch activity & pull requests
- feature-cavityBPM
- feature-PromptSummary
- Sakib is still working on the formatting and adding in the new combinations. He expects that to be done in a few days.
- bugfix-AggrigatorStringHandling
- Probably ready submit a pull request. But Cameron had started implementing a new regression functionality into that branch. He will split it out, and revert the bugfix branch, test it, and submit a pull request.
- regression analysis
- Comparison between postpan and japan-correlator
- Not yet reported upon
- Comparison between postpan and japan-correlator
- feedback
- PK will follow up with Amali
- Beam modulation
- Updates to the bmwClient
- Ye has made the changes to the client, but hasn't had a chance to test.
- Decoding and BMOD tree extraction
- Updates to the bmwClient
- VQWK adcs
- One last module is ready to be tested
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- Updating EPICS decoder lists for PREX variables
- Bob's DAQ tasklist
- Timing: mostly understood, still small mysteries (LNE)
- Current plan is to work on this early next week (Apr29)
- Synchronization-check system. w/help from Ed Jastrzembski
- Clean up cabling, labels, fasteners - First need to examine all signals
- CH crate has a preliminary cleanup and Caryn is checking signals
- Clean up CRL -- eliminate so-called "dirty trick"
- ??
- Check the 7200 scaler setup at injector, find a spare 7200.
- Talked to Bob related to timing. Event counters
- Pedestal studies, aka cross-talk
- Tao will look into it soon.
- Green Monster rework: Adam.
- automatic production of run-dependent database
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Document everything. Circuit diagrams, cable map, "how to".
- Timing: mostly understood, still small mysteries (LNE)
- Thinking about the tune mode scan
- How long do we want to integrate? Beam pulse may be 360 us long, followed by a 4us pulse for tracking the linac pass.
- Can we do all of the gate shifting with the VQWK gate delay, or de we need to use a timing board?
Present
Wouter, Cameron, Tao, Ye, Sakib, Paul K.