April 30th, 2019 Testers: Cameron Clarke, Caryn Palatchi, Paul King

Goals

  • Finalize timing of Parity DAQ
  • Include run-time scripts in CEDIT config
  • Plan/code up the Tune Beam VQWK Gate scanning (incorporate scalers and HAPPEX ADCs too?)
  • Add Inj DAQ to sync check system
  • Add batteries for pedestal studies

Add Batteries and finalize maps

  • Cameron and Caryn added batteries into the CH and INJ
    • 3 Volts in INJ ADC_11_06, INJ ADC_00_07, -1.5 Volts in CH ADC_05_02
  • Put Beam Sync from Patch Panel into CH ADC_05_01, and BPM trig signal into CH ADC_05_00
  • Put IOCse9 BPM 12 wires 002, 003, 004, 005 ( = xp, xm, yp, ym), BPM 14 wires 001, 011, 012, 013 (same ordering), and BPM 08 wires 006, 007, 008, 009 (all linac style) into CH wires that are plugged into ADCs
  • Plugged BPM 002 into INJ scaler V2F signals (needs some clock software work)
  • Another INJ ADC_0 bpm should be added and another V2F bpm should be added too

Run List

  • 2102 - test new maps, errors with pattern phase counter (and V2F clock missing and NSamples wrong)
  • 2103-2106 - same errors
  • 2107 - Fixed the pattern phase
  • 2108 - Longer run, still fixed