GEM Meeting/20190510

From PREX Wiki
Revision as of 15:33, 10 May 2019 by Chandabindu (talk | contribs)
Jump to navigationJump to search

Back to Main Page >> GEM_Meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  998 903 0149
 Bluejeans link: https://bluejeans.com/9989030149

Agenda

Minutes

  • Dustin: The frame for main detector is ready to go. But cann't put anything there unless the UVa GEM is ready.
  • Chandan: Devi is working for S3 mount design.
  • Dustin: We need Z-position and transverse positions of the AT detectors.
    • Seamus: Ryan is supposed to give those dimentions.
  • Dustin: By next weekend, we expect to be ready with RHRS.
  • Chandan: The was good progress on counting DAQ work.
  • Chandan: We will plan to take cosmic data using VDC in the weekend.
  • Siyu: One GEM detector is already moved inside the Hall. Working on cable mounting. The detector will be mounted on hut on Monday.

Present

Dustin, Seamus, Chandan, Ryan, Siyu, Ye Tian

Excused