20190529-Analyzer-Mtg
From PREX Wiki
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
Analyzer code updates
- Recent branch activity & pull requests
- Have merged several of the pull requests in
- One which is pending is to remoive the outdated "qwparity_simple" executable
- burpcuts
- this is not quite the same as the stability cuts. I have a framework idea in progress, may be ready to hand off to someone later today or tomorrow
- miniruns & regression analysis
- Several issues have been opened relating to getting the minirun functionality. It will be based on the burst analysis.
- RR is working on getting the corrected detector values, and will put into github soon
- Sent an example of the current correlator output to Sakib to include in aggregator.
- feedback
- Want to add HC calcuation of means and widths to the feedback engine to send to EPICS for OPS to look for correlations with machine configuration
- Total "lag" from feedback has been looked at briefly and seems to be a few seconds
- Beam modulation
- Updates to the bmwClient
- Plan to test changes tomorrow (May 30) sometime
- Decoding and BMOD tree extraction
- RR was working on the BMOD tree extraction, but was pulled off to work on the miniruns and greenmonster. He'll push a work-in-progress branch with what he had so we can hand off to someone else
- Updates to the bmwClient
Hardware/DAQ tasklist
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- Timing: mostly understood, still small mysteries (LNE)
- Synchronization-check system. w/help from Ed Jastrzembski
- Clean up cabling, labels, fasteners - First need to examine all signals
- Clean up CRL -- eliminate so-called "dirty trick"
- CC: that is Bob’s court. PK: we should look at the CH and injector CRLs once we finish up with the timing and beamMod client.
- Pedestal studies, aka cross-talk
- Green Monster rework: Robert
- automatic production of run-dependent database
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Document everything. Circuit diagrams, cable map, "how to".
- CC: will make circuit diagrams.
- ADAQ and HDD system monitoring
- Remote power supply cycling capability:
- CC: asked Alex about this and he said there are some. Will investigate further.
ReSpin of APEX runs
- Aggregator Sakib:
- Pass 2: Paul
Present
Paul K., Michael V., Cameron, Tao, Bob M., Devi, Robert R. Sakib
Excused
Wouter