CODA
From PREX Wiki
Revision as of 10:10, 12 June 2019 by Juliette Mammei (talk | contribs) (→Instructions for shift checklist)
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< HOW TOs
Starting Parity DAQ CODA
Starting the GUI
- Log in as apar@adaq1
- In a terminal type startcoda
- 4 xterms will appear (red, orange, green and yellow) as well as the main CODA window (see Figure 1)
- CODA will automatically load the last configuration used. If you are ok with this then just go to Platform->Connect
- To change the configuration, choose Configurations->Cool
- Select the desired configuration from the dropdown list
- Production running would be ALL_PREX
- Once you have loaded a configuration, some of the icons (see descriptions below) will change from grey (see Figure 2) to green (Figures 3-5)
- Press the configure icon (see Figure 3)
- Warnings about waiting for a ROC can be ignored if it does not take too long to respond (~10s) and things are eventually successful
- Error messages should be taken seriously
- You can try a Reset and re-Configure
- If that doesn't work - see DAQ Troubleshooting
- Press the Download icon (see Figure 4)
Starting a run
- After starting the GUI and loading a configuration (see above)
- Press the Prestart icon (see Figure 4)
- As above, warnings about waiting for a ROC can be ignored (if it does not take too long to respond, ~10s) and things are eventually successful
- Error messages should be taken seriously!
- You can try a Reset and re-Configure
- If that doesn't work - see DAQ Troubleshooting
- Press Go (see Figure 5)
- a window will pop up where you can add notes (see Figure 6)
- you can click the buttons to choose the data that goes to the runDB
- you can also add a comment at the bottom if needed
- Press "CLICK HERE TO ACCEPT AND START THE RUN"
- the event counter should start incrementing (see Figure 7)
- the event rates should be expected values
- a window will pop up where you can add notes (see Figure 6)
- If you made a mistake, such as:
- accidentally loading the wrong configuration
- stop and restart the run
- make a followup halog entry and refer to the run
- take note of it in the run list in the shift summary
- accidentally submitting the wrong notes in the notes window
- you can let the run continue as long it is the correct configuration
- make a followup halog entry and refer to the run
- take note of it in the run list in the shift summary
- accidentally loading the wrong configuration
Ending a run
- Press End
- A window should open so that you can add any needed comments (see Figure 8)
- add any notes if necessary
- Press "CLICK HERE TO ACKNOWLEDGE AND EXIT"
- if this was a normal end of the run, and it ends successfully
- all the states should change to downloaded
- the Prestart icon should be green
- A window should open so that you can add any needed comments (see Figure 8)
- If the run ends because of a problem with CODA - see DAQ Troubleshooting
Description of the GUI
Numbered from the top left of the GUI window (see any of the Figures):
- Configure (tools) - this opens a drop-down menu to choose the configuration
- Download (floppy disk) - this loads the chosen configuration to the crates
- Prestart () - this will prepare to start a run
- Go (triangle with point to right) - this starts a run
- End (square) - this ends a run
- Fast Start (double-triangle pointing right) tries to go through all the steps (can be used as long as things aren't changing)
- Reset (double-triangle pointing left) configured, but not downloaded (if you need to change configuration or GUI is wonky)
- Pause (two vertical bars) - pauses a run (rarely used - to quote Paul King "Nothing good can come of this.")
Instructions for shift checklist
- Latest run type (Test, Physics,..)
- You can get this from the auto-logs of start and stop runs
- It is also in the runstart and runend windows
- Is the auto replay script running?
- ask the analysis expert
- Run added to shift summary?
- keep up with the run list in your shift summary
- Please attach the left/right HV and Scalers Screenshots to the shift report (do we need this)?
- Time of beginning of latest run
- This is at the top of the CODA Run Control Window
- You also can get this from the auto-logs of start and stop runs
- Latest run number
- Dead time (%)