Detailed Calibration plan

From PREX Wiki
Revision as of 08:51, 25 June 2019 by Caryn Palatchi (talk | contribs) (Created page with "== Beamline instrumentation calibration == #* No target. #* 50uA beam current, through Compton (backgrounds on fingers and Compton photon detector). # <font color="blue">High...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Beamline instrumentation calibration

    • No target.
    • 50uA beam current, through Compton (backgrounds on fingers and Compton photon detector).
  1. High current with target 0.5 shift Ciprian G, Dustin M:
    1. Establish 4x4 raster. Insert lead target.
    2. Detector and SAM voltages (Dustin M)
  2. Beamline instrumentation calibration 0.5 shift Caryn P,
    1. Current ramp for BPM/BCM calibrations and detector pedestals detailed plan
  3. Initial production condition test 0.25 shift Caryn P,
    1. detector and SAM widths
    2. regression sensitivities
    3. beam noise and asymmetry check
    4. collimator water and thermocouple temperatures,
    5. radiation monitors and ion chamber stability
  4. Width studies 0.5 shift KK,
    1. detector and SAM widths, targets, shutters, etc
    2. deinstall shutters at conclusion of test