Detailed Calibration plan

From PREX Wiki
Jump to navigationJump to search

Beamline instrumentation calibration

  1. Check the following
    • No target.
    • 50uA beam current, through Compton (backgrounds on fingers and Compton photon detector).
  2. ITEM1 ITME2 Ciprian ITEM3:
    1. Establish 4x4 raster. Insert lead target.
    2. Detector and SAM voltages (Dustin M)
  3. Beamline instrumentation calibration 0.5 shift Caryn P,
    1. Current ramp for BPM/BCM calibrations and detector pedestals detailed plan
  4. Initial production condition test 0.25 shift Caryn P,
    1. detector and SAM widths
    2. regression sensitivities
    3. beam noise and asymmetry check
    4. collimator water and thermocouple temperatures,
    5. radiation monitors and ion chamber stability
  5. Width studies 0.5 shift KK,
    1. detector and SAM widths, targets, shutters, etc
    2. deinstall shutters at conclusion of test