Beamline instrumentation calibration
- Check the following has been performed
- No target.
- 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector).
- Establish 4x4 raster. Insert lead target.
- Detector and SAM voltages (Dustin M)
- Beamline instrumentation calibration 0.5 shift Caryn P,
- Current ramp for BPM/BCM calibrations and detector pedestals detailed plan
- Initial production condition test 0.25 shift Caryn P,
- detector and SAM widths
- regression sensitivities
- beam noise and asymmetry check
- collimator water and thermocouple temperatures,
- radiation monitors and ion chamber stability
- Width studies 0.5 shift KK,
- detector and SAM widths, targets, shutters, etc
- deinstall shutters at conclusion of test