RunPlanDaily
From PREX Wiki
Jump to navigationJump to searchIn the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Tuesday, June 25 | Owl | No beam. shift cancelled. | |
Day | Target cooling down. | shift cancelled | |
Swing | Optics. | Vacuum issue. No beam for the whole shift. | |
Wednesday, June 26 | Owl | Optics. | |
Day | Optics. Send beam through Compton chicane. | Optics complete. Vacuum valve VBV1P03 (compton table) can't be opened. | |
Swing | Low current cavity lock test. Optics. Q^2 measurement (Bob or Kent). Opportunistic: SAM test. | ||
Thursday, June 27 | Owl | Detector alignment. Detector rate. | |
Day | Send beam through Compton chicane. Compton commissioning. Beam instrumentation calculation (Caryn) | ||
Swing | Production condition test. Width Studies (KK) | ||
Friday, June 28 | Owl | ||
Day | |||
Swing | |||
Saturday, June 29 | Owl | ||
Day | |||
Swing | |||
Sunday, June 30 | Owl | ||
Day | Moller commissioning. | ||
Swing |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting