PREx TODO List:


The following tables show the auxiliary measurements for the remainder of PREx.
This will be discussed at the June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.

The plans belong to 3 categories of priority:

  • Plans we MUST perform.
  • Plans we'd LIKE to perform, but lower priority.
  • Plans we MAYBE want to do (very low priority).
"MUST DO" Plans
 Plan  
Duration 
 Personnel 
Blinded Tube Test 
4 hours (access) 
D. McNulty, K. Kumar, J. Wexler 
Further Current Calibrations with PREx Det 
2 hours 
Z. Ahmed 
Transverse Polarization Measurements.
8 hours 
Setup: J. Grames 
High Statistics Lead Inelastics 
3 hours 
R. Michaels 

"LIKE TO DO" Plans.
 Plan  
Duration 
 Personnel 
Oversampling by 2 at 120 Hz 
few days 
setup by experts 
Q2 with GEMs 
6 hours 
S. Riordan, A. Camsonne, K. Saenboonruang 
Backgrounds: Dipole Scan, up and down 
6 hours 
D. McNulty 
Beam-Induced Linearity Studies 
2 hours 
K. Kumar, K. Paschke, R. Silwal 

MAYBE Plans. Rather low priority.
 Plan  
Duration 
 Personnel 
Further 10 nA Cavity Monitor Tests 
4 hours 
Z. Ahmed, R. Michaels 
More Moller Commissioning 
12 hours
Moller crew (note Sasha is leaving town) 

Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".


Bob edited the above table per KK's request


By Joe Grames: Hi Bob,

Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.

Most importantly give the PD some advance warning.