WAC Notes July 23 2019

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions

WAC Notes July 22 2019 << >> WAC Notes July 24 2019

July 23 2019

  • Slug 12 is the first without the old PREX 1 quartz - from here on we are using different quartz: HALOG

Production Run List

Start Slug 12 at junk run 3583, IHWP In, FFB on always, no RHRS, new PREX II quartz

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

  • Updated prex_maindet.3583-.map
    • Removed not_blindable and not_normalizable from RHRS MAIN detectors
    • Removed not_normalizable from RHRS AT detectors
  • Updated prexCH_beamline_eventcuts.3583-.map
    • bcm, bcm_an_ds, 55, 1e6, g, 0.8
    • bcm, bcm_an_us, 55, 1e6, g, 0
    • all other cuts as of before
  • based on HALOG
    • Updated prexCH_beamline_pedestal.3583-.map
    • Updated prex_maindet_pedestal.3583-.map
    • Updated prex_sam_pedestal.3583-.map

Issues

Other Status Updates

  • Accumulated charge =
  • Slug 12 is the first without the old PREX 1 quartz - from here on we are using different quartz: HALOG